Nova Scotia Power Loading Facility Phase 1 Assessment, Halifax, NS

 

HEC completed an assessment of the existing condition of a variety of marine structures at the Tufts Cove Loading Facility. Structures included steel sheet pile (SSP) walls, closed cell SSP structures, and in water utility bridge bents. Following the assessment, HEC completed repair prioritization and initial cost estimates for a variety of repairs required around the facility.

Client: Nova Scotia Power

Year: 2013

Role: Phase 1 condition assessment, concept repair development and capital cost estimates